Is Welding Required for the Lippert Ground Control 3.0 Leveling System
Updated 08/10/2020 | Published 03/23/2017 >
Question:
I ask how you remove the old front landing gear and put themes electric ones on. I got back an answer that the front ones had to be welded. Your article said they bolt on. Also, I still dont understand how you get the trailer in position to be able remove the old ones and get the new ones in place to bolt or to weld. But do you bolt or weld these???
asked by: Jack B
Helpful Expert Reply:
Welding is usually not required for the Lippert Ground Control 3.0 Leveling System, # LC358590. The taller front jacks will replace your existing landing gear legs that should be mounted to the trailer to brackets with a bolt. and the smaller rear jacks can bolt to the frame. I have attached a link to the installation instructions for you to check out.
The only time welding may be required is if the frame brackets for the front jacks do not match up with the weld stops on the outer tubes of the front jacks. If that is the case, then the frame brackets would have to be cut off of the frame and welded at the proper location. I attached a diagram that shows the measurements that you will want to look at to see if the front jacks will fit your trailer.
There are a few ways to get the trailer in position to swap out the jacks. The installation instructions call for jack stands on all four corners of the unit and remove any underside paneling or rock guards where necessary. Some people will hook the trailer to the truck and chock the wheels and use the truck to support the pin weight while swapping out the front landing gear legs.
Product Page this Question was Asked From
Lippert Ground Control 3.0 Electric 5th Wheel RV Leveling System w Touchpad - 4-Point Set
- Camper Jacks
- 5th Wheel Camper
- Stabilizer Jacks
- Steel
- 10001 lbs or More
- Electric Jack
- 36 Inch Lift
- Bolt-On
- 4 Jacks
- Lippert
more information >
Featured Help Information
Instructions
Continue Researching
- Shop: Lippert Ground Control 3.0 Electric 5th Wheel RV Leveling System w Touchpad - 4-Point Set
- Shop: Replacement Front Foot Pad for Lippert Components Ground Control 3.0 Leveling System
- Shop: Curt 26x41 ATV Cargo Carrier
- Q&A: Replacement Fireplaces For Greystone 36 Fireplace With Lost Remote
- Shop: Replacement Foot Pad for Lippert Hydraulic Ground Control Leveling System - Qty 1
- Shop: Replacement Remote for Greystone RV Fireplace
- Shop: Andersen Ultimate Connection 5th Wheel Trailer Hitch System with Adapter - 20,000 lbs
- Shop: Replacement Foot Assembly for Lippert Components Power Stabilizer Jacks - Qty 1
- Search Results: am3220
- Search Results: 40549
- Search Results: tape rv roof repair
- Search Results: 21500
- Search Results: roof tape
- Article: Types of Trailer Hitches: How and Why to Use Each
- Shop: Trailer Hitch
- Q&A: Best Replacement for Powertek PDC3009
- Q&A: Replacement 12 Volt RV Refrigerator for Norcold 2118
- Search Results: refrigerators
- Q&A: Will the MORryde Short Safe-T-Rail Telescoping RV Hand Rail Work on a 2014 Keystone Avalanche?
- Q&A: What Are Dimensions Of The BTR E-Z Lube Spindle for 2,000-lb Trailer Axles TRU44FR?
- Q&A: Best Auto Leveling System for 2014 Keystone Avalanche 5th Wheel Trailer
- Q&A: Installation Instructions for Replacement I-Beam Jack Bracket for Lippert Ground Control 3.0
- Article: 30-Amp and 50-Amp RV Service: What's the Difference?
- Article: 4 Steps to Choosing Your 5th Wheel Pin Box
- Article: Our Team Picked The Best Camping Gear of the Year - Here Are Their Top Choices
- Article: Sidewinder with Rotating Turret for Short Bed Pickups
- Article: Wiring Trailer Lights with a 7-Way Plug (It's Easier Than You Think)
- Article: Trailer Wiring Diagrams



Paul M.
7/31/2020
My RV (2014 Jayco Pinnacle 42 feet) has 4 point Atwood levelegs, which are completely fried. I will be putting on a 6 point lippert 3.0 system. Question is my front landing legs have frame clamps wielded on the frame 12.5 inches apart from each other. When the new legs arrive can I smash down one wielded stop and wield on a new chunk of metal to the leg to fit between my existing frame wielded clamps, or do I have to grind off all 4 frame clamps and re-wield them back on the frame to match up with the 17.5 inch spacing of the new lippert legs. Other question would be leaving the inplace clamps in place and wielding on new clamps, if they are even available to obtain?