How Far Apart Are Holes on Handrail for First Generation 4-Step MORryde Steps
Updated 07/15/2024 | Published 07/06/2024 >
Question:
Hello, I have a 2017 Dutchmen Voltage Epic Series 3990. The Fold-Out Front Entry Steps 4-step are by MORryde. I measured the bolt holes for the optional Hand Rail. The holes are 5 inch apart on center for each vertical part of the Hand Rail. Could you please verify this, so I can be sure that Im ordering the correct Hand Rail... Thanks, Robert G
asked by: Robert G
Helpful Expert Reply:
Hello Robert,
I can indeed verify for you the holes are 5 inches apart for the Handrail for First Generation 4-Step MORryde Steps # MR33RR.
The accompanying photo from MORryde shows these dimensions as well.
Product Page this Question was Asked From
Handrail for First Generation 4-Step MORryde Steps
- Accessories and Parts
- RV Steps
- Grab Handles and Handrails
- Folding Handrail
- MORryde
more information >
Continue Researching
- Search Results: rv water filter
- Video: Review of Camco RV Water Filter - Water Filter Cartridges - CAM40621
- Shop: Handrail for First Generation 4-Step MORryde Steps
- Shop: Camco Replacement KDF/Carbon Filter Cartridge for RV and Marine Premium Water Filter
- Shop: Erickson E-Chock Wheel Chock for E Track - Powder Coated Steel - Qty 1
- Q&A: Are there Handrails for a MORryde Steps?
- Q&A: What Versions of MORryde StepAbove RV Steps Have Hand Rails Available
- Q&A: Do You Have Hand Rails for RV Steps?
- Q&A: Steps Needed for 24" Doorway and 32" Entry Height
- Q&A: Determining if MORryde StepAbove is First or Second Generation to Pick Out Handrail
- Q&A: How to Determine What Generation of MORryde Steps You Have?
- Q&A: MORryde Safe-T-Rail - How Tall Is The Portion That Attaches To The Wall Of The Coach?
- Article: Trailer Lighting Requirements
- Article: How to Measure for Motorhome Steps
- Article: Dealer Spotlight - Hamilton Trailer Repair
- Article: Wiring Trailer Lights with a 7-Way Plug (It's Easier Than You Think)



Robert G.
7/15/2024
Thanks, Kyle