Estimated Installation Time of Curt Trailer Hitch # 11348 On a 2011 Nissan Versa
Updated 02/02/2011 | Published 01/31/2011 >
Products Featured in This Question
Question:
What is the approximate time to install this? I know it will vary, but would like a range of time expected for an experienced mechanic to install.
asked by: Bill
Expert Reply:
The estimated installation time for the Curt Trailer Hitch Receiver with Drawbar, part # 11348, is 30 minutes for a professional and 60 minutes for a Novice. Since you are an experienced mechanic, I would say it should not take you longer than 45 minutes tops to install.
The Curt Hitch # 11348 Includes a Drawbar, Pin and Clip. To complete your towing setup, you may be interested in the following items:
Vehicle Wiring, part # 118545
1-7/8 Inch Hitch Ball, part # 19256
2 Inch Hitch Ball, part # 19258
I have linked instructions for the Curt Trailer Hitch Receiver with Drawbar, part # 11348, that details all the installation information.
Product Page this Question was Asked From
Curt Trailer Hitch Receiver - Custom Fit - Class I - 1-1/4"
- Trailer Hitch
- For Towing
- Class I
- 200 lbs TW
- 2000 lbs GTW
- 1-1/4 Inch Hitch
- Visible Cross Tube
- CURT
more information >
Featured Help Information
Instructions
Continue Researching
- Article: How to Correct Noise from Exhaust Rattling Against a Trailer Hitch
- Article: How to Choose the Right Trailer Hitch Class
- Q&A: Recommendation for Carrying 250cc Dirt Bike with 2012 Nissan Versa Sedan
- Q&A: Does Hopkins Wiring Harness Fit 2020 Nissan Versa S
- Q&A: How to Carry 3 Bikes on a 2015 Nissan Versa Note
- Q&A: Replacement Power Control Module for Kwikee Part Number 1800709
- Q&A: Replacement Kwikee Step Controller for Part 1800709 on 2017 Thor Windsport
- Q&A: Curt Trailer Hitch Receiver Fit for 2019 Nissan Rogue Sport
- Q&A: Do Lights have to be Added to a Trailer Hitch Mount Cargo Carrier

